Statement of work and cost justification
For phase 2
Given the success that the phase one of the MAX project --“might augmenting exoskeleton”
Mindtel has been requested to be the lead agent assessing design elements of the “might augmenting exoskeleton”, and for identifying other applications of this material. Mindtel will supervise the design and development and be the liaison between the developers and the military
Mindtel’s responsibilities will include the following
- this in includes usability, safety, and operational utility
Mindtel has agreed to perform these duties requested by the sponsor for a fixed price of $50,000
The period of Mindtel’s performance is expected to be 5 months
Cost Justification.
The following budget reflects the estimated cost/effort level required
perform the Task. This estimate is consistent with experience from recent
efforts of a similar nature, with the sponsor.
LABOR
Senior consulting $150/hr (discounted GOVT rate)
Dr Dave Warner MD,
This individual has been involved with the sponsors project from the
initial efforts. He will bring continuity to the program as it iterates
progressively in the next efforts.
Dr Warner will work with the sponsor to ensure the
operational utility of the system being developed for DARPA.
Technical consulting $100/hr
(technology specific domain experts, engineers and scientists)
Due to the diverse range of individual technologies that are required
to meet the operational needs of the sponsor, it is important that an expert
the field be consulted. This ensures the most efficient use of funds for development.
Technology development/rapid prototyping $125/hr
(industrial designer's, fabrication specialists)
This effort will require that actual physical prototypes continue
to be fabricated so they can be tested by the actual end users in an operational
environment.
TRAVEL
(transportation, lodging, meals)
----- average # of people 2-3, average number of days 2-4---
Anticipated destinations of required travel
4 Trips to Washington DC Area (DARPA, Quantico, NRL, )1.1K/person/trip
3 Trips to San Diego Area (SPAWAR, Camp Pendleton,) 1.2K/person/trip
(this includes several visits to the NextPlanet site)
1 Trip to Boston Area (Draper, SSC-Natick,) 1K/person/trip
MATERIALS
Testing materials $7K
This includes safety gear for early operator and
Misc. Supplies for field testing $8K
This includes costs of shipping and field repair of prototypes.
The cost of building and dismantling a field-testing unit are also included
Experience on this project has shown that there substantial
costs incurred when testing the devices.
Budget summary
Labor 20,000
Travel (calculated for 2 persons per trip) 15,000
MATERIALS 7,000
Misc. Supplies 8,000
Total $50,000